< Back to News

WONGAVERY GALLERY OPENING

JUNE 2022

WongAvery Gallery opening

HRH The Duke of Gloucester officially opened the WongAvery Music Gallery for Trinity Hall on the 24th June.

During the dedication ceremony in the Music Gallery, Vice-Master Dr Daniel Tyler and Vice-Chair of the Avery-Tsui Foundation Natasha Wong, addressed the guests, before a dedication given by alumnus Revd Cortland Fransella. The ceremony concluded by the Director of Music Andrew Arthur, who played a piece on the piano in the new space.

Dr Tyler said: “Avery Court has been transformed by the addition of the WongAvery Music Gallery. This state-of-the art musical recital and rehearsal space is a stunning addition to the College. We are grateful to His Royal Highness for formally opening the building.

“We offer our sincere thanks to the Avery-Tsui Foundation for their support. It is wonderful to be in this space at the heart of Trinity Hall and know that it has been built thanks to the love of music and the love of the College on the part of a former student and his family. I am sure it will inspire future generations of students.”

A SITE FOR SAURIIS

JANUARY 2017

A Site for Sauriis

Our proposal to redevelop the grounds of the Natural History Museum is due to start on site this month. The work to the main entrance – the first of three phases – will introduce level access to this area for the first time while also restoring the Grade-I listed fabric to its former glory.

The works include changing levels, repaving the forecourt, restoring railings, installing planting, and repairing or reinstating original terracotta details across the site.

Ahead of this, the main entrance and central hall of the Museum are now closed while both teams gear up for construction – including some unusual enabling works. As part of these works Dippy the diplodocus has now been dismantled ahead of going on tour around the country; to be eventually recast in bronze for the next phase of our project.

The railings have now been removed for off-site restoration and re-painting:

And scaffolding is also going up for the removal of display cases and various specimens:

This will need to go up again halfway through construction of Phase 1 allow for delivery of the blue whale skull through our active site. Here it is just before it left the Museum.

If you’re wondering how that that will fit through the front doors, the answer’s simple: the same way the elephants do.

Phase 1 is due to complete mid-July ahead of the main entrance reopening to the public shortly after. In the meantime, there’s a pop-up conservation studio in the Darwin Centre – which we highly recommend – where you can see the conservationists at work restoring the whale’s bones.