< Back to News

TAPESTRY BUILDING PROGRESS

MARCH 2015

Tapestry Building Progress

Looking south from the roof garden, the view is framed by the ‘beak’ of the building looking south over Regents Canal and out towards the BT tower.

The concrete frame of the Tapestry (T1) building is approaching completion, with just two more floors to be constructed. This space on the 8th floor will become an outdoor roof garden enclosed either side by two level ‘townhouses’ and a tower to the north. The area will be open to residents and landscaped with trees and gardens.

OLYMPIC HOUSING SHORTLISTED FOR CONCRETE AWARD

OCTOBER 2012

Olympic Housing Shortlisted for Concrete Award

The Concrete Society has shortlisted Niall McLaughlin Architects’ for the Creativity in Concrete Award for the practice’s facade for the Olympic Housing Block N15 in Stratford, East London.

The below image shows the 3D Scanning of the Elgin Marbles in the British Museum.