SOMERSET HOUSE COMPETITION WIN
JANUARY 2020

We are delighted to announce that Niall McLaughlin Architects has been appointed to design a new, multi-purpose auditorium and public space. This follows an international competition (organised by Colander Associates) which had a total of 69 entries from an impressive calibre of architectural teams. Eight teams were shortlisted which included Adjaye Associates, Barozzi/Veiga with DRDH, David Chipperfield Architects, Flores Prats with AOC Architects, Haworth Tompkins with Citizen’s Design Bureau, Snohetta with Orms, Studio Seilern, and Niall McLaughlin Architects. The jury, comprising Jonathan Reekie (Director, Somerset House Trust), Julia Barfield (Architect), Martine d’Anglejan Chatillon (Trustee and arts producer), Brian Eno (Trustee and artist/musician), Sarah Gaventa (Director of Illuminated River), Paul Goswell (Trustee and MD of Delancey) and Paul Purgas (Artist and Somerset House Studios resident), was unanimous that Niall McLaughlin Architects’ presentation gave a strong sense of design direction and clarity of thought, with an unmatched commitment to sustainability and a distinctly creative and collaborative approach. The jury felt confident that in our hands, the team would deliver Somerset House’s vision of creating a world-class performance space to make and showcase new, cutting-edge multi-disciplinary work to new, younger and more diverse audiences.
A SITE FOR SAURIIS
JANUARY 2017

Our proposal to redevelop the grounds of the Natural History Museum is due to start on site this month. The work to the main entrance – the first of three phases – will introduce level access to this area for the first time while also restoring the Grade-I listed fabric to its former glory.
The works include changing levels, repaving the forecourt, restoring railings, installing planting, and repairing or reinstating original terracotta details across the site.

Ahead of this, the main entrance and central hall of the Museum are now closed while both teams gear up for construction – including some unusual enabling works. As part of these works Dippy the diplodocus has now been dismantled ahead of going on tour around the country; to be eventually recast in bronze for the next phase of our project.

The railings have now been removed for off-site restoration and re-painting:

And scaffolding is also going up for the removal of display cases and various specimens:

This will need to go up again halfway through construction of Phase 1 allow for delivery of the blue whale skull through our active site. Here it is just before it left the Museum.

If you’re wondering how that that will fit through the front doors, the answer’s simple: the same way the elephants do.

Phase 1 is due to complete mid-July ahead of the main entrance reopening to the public shortly after. In the meantime, there’s a pop-up conservation studio in the Darwin Centre – which we highly recommend – where you can see the conservationists at work restoring the whale’s bones.