< Back to News

OPENING OF LAMDA

JUNE 2017

Opening of LAMDA

Our newly completed building for the London Academy of Music and Dramatic Art has its official opening on the 14th June.  Her Royal Highness Princess Alexandra, the Royal Patron of LAMDA will be in attendance.  The project included the formation of a new black-box studio theatre and associated front and back of house facilities to the existing building, construction a new 6,000m2 building providing ten new flexible drama/ dance studios, a second black-box studio theatre and foyer, a full size training auditorium and ancillary accommodation.

OUTPATIENT’S BUILDING

JUNE 2015

Outpatient’s Building

New windows have been cut into the existing masonry walls of the Outpatient’s Building. These windows create a visual connection between the east and west wing rooms, across a double height space of pre-cast columns and beams.