< Back to News

NATURAL HISTORY MUSEUM PROGRESS

MARCH 2017

Natural History Museum Progress

Below are some from the Natural History Museum site showing the scaffold ‘tunnel’ going up at the Museum. This is the framework required to lift, manipulate, and move the blue whale skull into position in a few weeks.

Though the main hall has had a sperm whale in it before, this was only around 15m long. In contrast, the blue whale, the largest known animal to have ever existed, is about 30m long once assembled.

Unfortunately, due to the various extensions and alterations to the Museum over time, the skull can only come in via the front doors. And – much like a very large, very heavy, very valuable sofa – it’s a case of squeezing it in at strange angles.

T1 BUILDING

NOVEMBER 2014

T1 Building

The Argent T1 building, which is currently under construction as part of the redevelopment of the Kings Cross area. This photo is taken from the public viewing windows in the hoardings alongside Regent’s Canal. For more information on the project, visit the project page on the website here.