< Back to News

NATURAL HISTORY MUSEUM PROGRESS

MARCH 2017

Natural History Museum Progress

Below are some from the Natural History Museum site showing the scaffold ‘tunnel’ going up at the Museum. This is the framework required to lift, manipulate, and move the blue whale skull into position in a few weeks.

Though the main hall has had a sperm whale in it before, this was only around 15m long. In contrast, the blue whale, the largest known animal to have ever existed, is about 30m long once assembled.

Unfortunately, due to the various extensions and alterations to the Museum over time, the skull can only come in via the front doors. And – much like a very large, very heavy, very valuable sofa – it’s a case of squeezing it in at strange angles.

RIBA JOURNAL FEATURE ON THE BISHOP EDWARD KING CHAPEL

JULY 2013

RIBA Journal Feature on the Bishop Edward King Chapel

Under the tile ‘Happy Ending’, Jan-Carlos Kucharek has reviewed the Chapel for Ripon Theological College in Oxfordshire. The article reflects on the conversations with the client to develop the design, together with the stories and architectural precedents that worked together to inform the building’s final form. Kucharek writes, “…there’s no questioning the positive effect of McLaughlin’s £2.6m chapel on the picturesque Ripon College, both functionally and aesthetically.” He goes on to describe the elliptical form, accessed on the diagonal between the long and short axes, as “a master stroke.”