< Back to News

Maggie's Cambridge Receives Planning

April 2025

Maggie's Cambridge Receives Planning

The Maggie's Centre in Cambridge has won planning permission. The purpose-built structure will replace an existing, temporary Maggie’s Centre which, since 2012, has been housed within a converted key worker residential block. 

Maggie’s chief executive Laura Lee said: ‘We've worked closely with Cambridge University Hospitals NHS Foundation Trust for many years to ensure people with cancer across the Cambridgeshire area, as well as those who love them, have had free expert support at our interim centre.

‘It is wonderful to now be a step closer to building a centre designed with people living with cancer in mind.’

You can read the Architect's Journal article about the centre here.

Natural History Museum Progress

March 2017

Natural History Museum Progress

Below are some from the Natural History Museum site showing the scaffold ‘tunnel’ going up at the Museum. This is the framework required to lift, manipulate, and move the blue whale skull into position in a few weeks.

Though the main hall has had a sperm whale in it before, this was only around 15m long. In contrast, the blue whale, the largest known animal to have ever existed, is about 30m long once assembled.

Unfortunately, due to the various extensions and alterations to the Museum over time, the skull can only come in via the front doors. And – much like a very large, very heavy, very valuable sofa – it’s a case of squeezing it in at strange angles.