< Back to News

LIVING WITHIN – MESSUMS WILTSHIRE

SEPTEMBER 2020

Living Within – Messums Wiltshire

Our exhibition piece Presences that was our contribution to the 16th International Architecture Exhibition, Biennale Architettura 2018 is to be part of an exhibition at Messums Wiltshire.

Their architectural models exhibition at Messums, which this year is centred on the role of creative spaces and set against the backdrop of Elisabeth Frink’s Woolland Studio. We will look at both the importance of creative space and highlight the beauty in the making of an architectural model with an exhibition including those designed for artists’ studios, galleries, arts schools and libraries.

The exhibition runs from 12th September until the 18th October. More information can be seen on the Messums website here.

CATHERINE HUGHES BUILDING PLANNING APPROVAL

MAY 2017

Catherine Hughes Building Planning Approval

Our new student accommodation scheme for Somerville College, has been awarded planning approval unanimously by Oxford City Council. The project, known as the Catherine Hughes Building, will provide 68 bedrooms, allowing the College to accommodate all their undergraduates on site. This is our third building for Somerville College, further to our work on the ROQ student housing and the extension to the Philip Dowson designed Wolfson building.

The new building has a frontage on to Walton Street, with a Graduate Reading Room at ground floor level. The use of red brick will reflect the neighbouring buildings, with articulated brickwork elements around generous windows to provide a rhythm to the façade. Framed setbacks at third floor level allow the new building to align with key levels on the adjacent Penrose Building and to provide variety to the roof line. Internally, bedrooms are arranged in to clusters with kitchens and circulation spaces utilising direct and borrowed natural light and forming focal points for social activity.

Enabling works, involving the demolition of existing buildings, are due to commence in the next few months, with the main construction expected to start on site at the beginning of 2018.