< Back to News

LARGE-SCALE MODEL MAKING

SEPTEMBER 2014

The use of physical models by architects is well established, and can be seen throughout history as the natural partner to drawings for exhibiting a proposal of the building prior to construction. Within our practice, models are rarely produced as mere presentation pieces, but rather as tools for exploration. This role makes them less precious and complete, with the ability to change and adapt the design following the feedback that the model has initiated.

The type of models that I enjoy most are those of a larger scale, of 1:20 and above where you are able to get your head inside and truly appreciate the space. In addition to the final form of such models, much is learnt through the process of construction. Structure, surfaces and junctions are some of the issues that require resolution during the making of the model. Within our studio space, we have a large area dedicated to model making, which allows for building and display of sizeable pieces.

Large Scael Model

During our work on a new build private residence in Hampshire, we carried out much of the design work on the external envelope through the use of physical models. They were worked up in increasing scales including a 1:10 piece of the facade. In particular, we were considering the form of the heavy external piers, fascias and cornices against the lighter timber elements that sat within them. We made the model using a similar sequence to the proposed building construction. We put the more solid facade elements in place so that we could begin considering a number of different forms for the timber window framing that sat within. The glazing was again produced in a similar method to the full-scale building, with a timber-framed bay built separately prior to installation in to the existing facade. We fixed these delicately so that removal would be possible.

We worked on a number of iterations of the window form, adapting the frames and constructing new versions when modification was not possible. Each time, the model was left on display within the studio so that everyone in the practice could consider the alternative versions and provide feedback. Once we had a favoured form, we used the same model to illustrate the proposal to the clients for approval.

I believe that such iterative assessments and amendments would only have been possible through the use of a large-scale physical model. Building models is about constructing space, and many of the activities are similar in technique and execution as the construction of a real building. By carrying out these actions in miniature we may appreciate the building as a physical form and understand the three dimensional mass. Building of models is our primary opportunity to test and refine our building form, whilst experiencing and discovering an approximation of the processes that will be required to make it.

Alastair Crockett studied at the University of Bath, University College London and London Metropolitan University. Since joining Niall McLaughlin Architects in 2012 he has worked on the T1 building in King’s Cross; a private residence in Hampshire and the Nazrin Shah Building for Worcester College in Oxford.

COLLABORATION WITH KIM WILKIE WINS NATURAL HISTORY MUSEUM COMPETITION

APRIL 2014

Collaboration with Kim Wilkie wins Natural History Museum Competition

Niall McLaughlin Architects with Kim Wilkie have won the bid to redesign the setting of the Natural History Museum, in a two-stage international competition, organised by Malcom Reading. The team was the unanimous choice of the jury, who included Graham Morrison of Allies and Morrison, former cabinet minister Michael Portillo, Sophie Andreae, a Trustee of Historic Royal Palaces and Dr Michael Dixon, Director of the Natural History Museum.

Jury chair, Ian Henderson said of the scheme, ‘The challenge was to find a team which would consider the changing nature of the Museum, a team who would think holistically, both spatially and intellectually, considering the Museum and the Grounds together. Niall McLaughlin Architects did this brilliantly.’

The commission gives the opportunity to re-imagine the extensive entrance grounds to the world famous museum in South Kensington, London and provide a fitting context for the architectural excellence of the 19th century Waterhouse building. The museum is a global leader in scientific research, housing over 80 million species from around the world and is one of the top visitor attractions in the UK.

The team is looking forward to working with the museum to develop a proposal that will transform the experience for the 5 million visitors that the museum welcomes each year and showcase the museum to the wider cultural quarter centered on the newly redeveloped Exhibition Road.

Link to the Architects Journal
Link to BD OnLine
Link to the Evening Standard