< Back to News

HAMPSHIRE HOUSE WINS A RIBA REGIONAL AWARD

MAY 2019

Hampshire House Wins a RIBA Regional Award

We are happy to announce that our project Hampshire House has won a RIBA Regional Award.

The project is a new build house situated in a riverside setting in Hampshire. The client wanted to create a contemporary house with a connection to the surroundings. The house is arranged in a series of staggered volumes, which are conceived of as an entrance to the landscape. The spaces frame the three key views; meadows, lakes and gardens. In the centre is the top lit, double height kitchen, around which daily life revolves. The walls are flint quoined in Purbeck stone and the main frame is precast concrete. Windows and cladding are made from oak which is untreated and will weather to match the colour of the locally sourced stone and flintwork.

CATHERINE HUGHES BUILDING PLANNING APPROVAL

MAY 2017

Catherine Hughes Building Planning Approval

Our new student accommodation scheme for Somerville College, has been awarded planning approval unanimously by Oxford City Council. The project, known as the Catherine Hughes Building, will provide 68 bedrooms, allowing the College to accommodate all their undergraduates on site. This is our third building for Somerville College, further to our work on the ROQ student housing and the extension to the Philip Dowson designed Wolfson building.

The new building has a frontage on to Walton Street, with a Graduate Reading Room at ground floor level. The use of red brick will reflect the neighbouring buildings, with articulated brickwork elements around generous windows to provide a rhythm to the façade. Framed setbacks at third floor level allow the new building to align with key levels on the adjacent Penrose Building and to provide variety to the roof line. Internally, bedrooms are arranged in to clusters with kitchens and circulation spaces utilising direct and borrowed natural light and forming focal points for social activity.

Enabling works, involving the demolition of existing buildings, are due to commence in the next few months, with the main construction expected to start on site at the beginning of 2018.