CIVIC TRUST AWARD WINNER
MARCH 2022

The Civic Trust Awards scheme was established in 1959 to recognise outstanding architecture, planning and design in the built environment.
The longest-standing built environment awards in Europe, their aim is to encourage the best in architecture and environmental design and to recognise projects that offer a positive cultural, social, economic or environmental benefit to their local communities.
The New Library was announced as the Eastern Winner from 160 entries from across the UK and Internationally. The judging panel commented: “The execution of the new library and its relationship with Magdalene College is delightful and appropriate and will be enjoyed by the college for many years to come.”
Fellow and Chairman of Cloverleaf, Professor Tom Spencer (1973) said: “We are so delighted with this Civic Trust Award which confirms what we already know - a brilliant building that works so well for us in so many ways."
A SITE FOR SAURIIS
JANUARY 2017

Our proposal to redevelop the grounds of the Natural History Museum is due to start on site this month. The work to the main entrance – the first of three phases – will introduce level access to this area for the first time while also restoring the Grade-I listed fabric to its former glory.
The works include changing levels, repaving the forecourt, restoring railings, installing planting, and repairing or reinstating original terracotta details across the site.

Ahead of this, the main entrance and central hall of the Museum are now closed while both teams gear up for construction – including some unusual enabling works. As part of these works Dippy the diplodocus has now been dismantled ahead of going on tour around the country; to be eventually recast in bronze for the next phase of our project.

The railings have now been removed for off-site restoration and re-painting:

And scaffolding is also going up for the removal of display cases and various specimens:

This will need to go up again halfway through construction of Phase 1 allow for delivery of the blue whale skull through our active site. Here it is just before it left the Museum.

If you’re wondering how that that will fit through the front doors, the answer’s simple: the same way the elephants do.

Phase 1 is due to complete mid-July ahead of the main entrance reopening to the public shortly after. In the meantime, there’s a pop-up conservation studio in the Darwin Centre – which we highly recommend – where you can see the conservationists at work restoring the whale’s bones.