< Back to News

BUILDING STORIES - 2022 RIBA

SEPTEMBER 2022

Building Stories - 2022 RIBA

On the 21st September at London's RIBA and the 4th October at the Everyman Cinema in Leeds, the architects shortlisted for the 2022 RIBA Stirling Prize will reveal the stories behind their buildings, what inspires them, and what it would mean to win the UK’s most prestigious architecture prize.  

The six shortlisted projects are:  

  • 100 Liverpool Street, Hopkins Architects  
  • Forth Valley College – Falkirk Campus, Reiach and Hall Architects  
  • Hackney New Primary School and 333 Kingsland Road, Henley Halebrown  
  • Orchard Gardens, Elephant Park, Panter Hudspith Architects  
  • Sands End Arts and Community Centre, Mæ Architects  
  • The New Library, Magdalene College, Niall McLaughlin Architects  

The architects behind the six shortlisted buildings will give brief presentations, followed by a panel discussion and a live Q&A with the audience.  Talking on behalf of our pratice to present the New Library, Magdalene College will be Claire McMenamin and Tim Allen-Booth. You can watch the RIBA London event here. 

CATHERINE HUGHES BUILDING PLANNING APPROVAL

MAY 2017

Catherine Hughes Building Planning Approval

Our new student accommodation scheme for Somerville College, has been awarded planning approval unanimously by Oxford City Council. The project, known as the Catherine Hughes Building, will provide 68 bedrooms, allowing the College to accommodate all their undergraduates on site. This is our third building for Somerville College, further to our work on the ROQ student housing and the extension to the Philip Dowson designed Wolfson building.

The new building has a frontage on to Walton Street, with a Graduate Reading Room at ground floor level. The use of red brick will reflect the neighbouring buildings, with articulated brickwork elements around generous windows to provide a rhythm to the façade. Framed setbacks at third floor level allow the new building to align with key levels on the adjacent Penrose Building and to provide variety to the roof line. Internally, bedrooms are arranged in to clusters with kitchens and circulation spaces utilising direct and borrowed natural light and forming focal points for social activity.

Enabling works, involving the demolition of existing buildings, are due to commence in the next few months, with the main construction expected to start on site at the beginning of 2018.