BUILDING ON THE BUILT
DECEMBER 2022

On the 7th December Níall wil be giving a talk at Jonathan Tuckey Design as part of their Building on the Built series.
Building on the Built is a programme of talks and other events, hosted by Jonathan Tuckey Design, which aims to promote the topic of architectural work connected with existing structures and, more specifically, to look at work that might challenge the way in which work on existing structures is approached today.
JESUS COLLEGE PLANNING APPROVAL
APRIL 2015

We have won planning and listed building consent for the first phase of a significant development for Jesus College, Cambridge.
The West Court development includes the sensitive refurbishment and extension of a Grade II Listed building to provide research facilities, offices, social spaces and accommodation. A new café pavilion and basement bar extends the building’s north elevation and provides a prominent link to the rest of the College.
A 1970s building closes the courtyard to Jesus Lane and will be refaced, refurbished and converted to provide a lecture theatre with research facilities and two floors of academic accommodation. Linking the two existing buildings, a new entrance building houses conference facilities and serves the lecture theatre, research spaces and an exhibition room. It will provide access to future phases of the development including a new purpose-built auditorium, formal courtyard and nursery along with storage, archive and sports facilities.
The Master of Jesus College, Professor Ian White, said “We are excited by the opportunity the West Court development brings to take the facilities we can offer to students, alumni and the wider world to a new level of excellence.”