< Back to News

BALLIOL FACADE TRIP

APRIL 2017

Balliol Facade Trip

We are working on new student residential buildings for Balliol College, Oxford. As part of the detailed design development we have been working with a façade sub-contractor based in Belgium, and recently made a visit to their manufacturing factories. The itinerary for the day – a design workshop, a factory tour and a review of samples. Lots of coffee after an early Eurostar, and a good lunch.

There had been several similar design workshops before; where gathered around the meeting table, sketches were scattered as we questioned the architectural intent and the construction details equally. Brick samples sat in front of us, books piled up with precedents opened, past project drawings and models pulled out for reference. How to compose the language to create a calm and unified façade across the site. The engineers, the architects, the craftsmen who will build the façade.

These sorts of discussion are an aspect of everyday practice, and incredibly valuable part of the process – marrying the conversations of design aspiration with the actual making of. The bricks and mortar that see the architecture delivered from the paper to the physical form.

ST CROSS GROUND BREAKING

FEBRUARY 2015

St Cross Ground Breaking

Building has started on our project for St. Cross College in Oxford. It will accommodate a library, seminar rooms and 53 post-graduate rooms just behind St. Giles. Soon after excavation started, we uncovered the shrouded remains of a woman buried in 1642 during the English Civil War.  Oxford Archaeologists dated her from the coins that had been placed on her eyes. After a pause to remove the remains, the builders have started foundations around the historic walls. Completion is expected by May 2016.

A Ground Breaking Ceremony was held on the site on 27th February.   Practical Completion of the building is anticipated in May 2016. You can follow progress on site by accessing the contractor’s webcam here (un:stcrosscollege; pw:oxford)