< Back to News

BALLIOL FACADE TRIP

APRIL 2017

Balliol Facade Trip

We are working on new student residential buildings for Balliol College, Oxford. As part of the detailed design development we have been working with a façade sub-contractor based in Belgium, and recently made a visit to their manufacturing factories. The itinerary for the day – a design workshop, a factory tour and a review of samples. Lots of coffee after an early Eurostar, and a good lunch.

There had been several similar design workshops before; where gathered around the meeting table, sketches were scattered as we questioned the architectural intent and the construction details equally. Brick samples sat in front of us, books piled up with precedents opened, past project drawings and models pulled out for reference. How to compose the language to create a calm and unified façade across the site. The engineers, the architects, the craftsmen who will build the façade.

These sorts of discussion are an aspect of everyday practice, and incredibly valuable part of the process – marrying the conversations of design aspiration with the actual making of. The bricks and mortar that see the architecture delivered from the paper to the physical form.

PARK HOSPITAL GRANTED OUTLINE PLANNING

JANUARY 2013

Park Hospital Granted Outline Planning

The development of Park Hospital has been granted Outline Planning Consent by the Oxford City Council. The project will redevelop the existing Park Hospital site into additional biomedical research facilities for Oxford University’s Old Road Campus.

The campus is one of the foremost biomedical research campus’ in the UK. As part of the University’s vision to remain a world leader in this field, the redevelopment of Park Hospital will provide an additional 48,000 square metres of accommodation for research and laboratory facilities.

The site is located in a challenging planning environment as it is adjacent to a local wildlife site, connected to the Lye Valley, a site of special scientific interest. Wide ranging consultation took place during the pre-planning phases of the application, on account of the ecological sensitivities of the site and to ensure that the development would benefit the local area.