< Back to News

BALLIOL FACADE TRIP

APRIL 2017

Balliol Facade Trip

We are working on new student residential buildings for Balliol College, Oxford. As part of the detailed design development we have been working with a façade sub-contractor based in Belgium, and recently made a visit to their manufacturing factories. The itinerary for the day – a design workshop, a factory tour and a review of samples. Lots of coffee after an early Eurostar, and a good lunch.

There had been several similar design workshops before; where gathered around the meeting table, sketches were scattered as we questioned the architectural intent and the construction details equally. Brick samples sat in front of us, books piled up with precedents opened, past project drawings and models pulled out for reference. How to compose the language to create a calm and unified façade across the site. The engineers, the architects, the craftsmen who will build the façade.

These sorts of discussion are an aspect of everyday practice, and incredibly valuable part of the process – marrying the conversations of design aspiration with the actual making of. The bricks and mortar that see the architecture delivered from the paper to the physical form.

COMPLETION OF CARMELITE CHAPEL

FEBRUARY 2014

Completion of Carmelite Chapel

The new Carmelite Chapel for the Discalced Friars in Clarendon Street, Dublin is now complete. The Chapel forms part of St. Teresa’s Church and Priory and uses a pared-back post-and-beam framework to create a space which is conducive to prayer, song and private contemplation. The series of cross-laminated timber frames are turned at right angles to enclose the four sides of the space and form a woven structural lattice.