Balliol College, Sports Pavilion

7:45 AM, London Bridge. The train from Uckfield just entered the station and is spitting out hundreds of commuters, flowing past us. We hop on the now empty train and leave London to visit our timber sub-contractor’s workshop in East Sussex.

We are fast approaching the construction stage of our Sports Pavilion project for Balliol College in Oxford and were invited to review a mock-up of the roof structure. The pavilion roof is formed of slender sweet chestnut glulam joists; 10 layers are stacked on top of each other, each layer cantilevering further into the space, creating a coffer.

1:50 model

From outside the roof structure expresses itself as a lantern, popping up in the centre of the building. The lantern is fully glazed, allowing for rays of sunshine to enter through the stacked glulam. In the evening, the dense timber lattice will be highlighted by a subtle glow, originating from LED strips, that are recessed in the top of the glulam joists.

The mock-up in Inwood’s (timber sub-contractor) workshop

Lighting strategy detail plan and section

The mock-up was used to test the connection details between the individual layers of glulam, the construction sequence, and the integration of the LED strips and the associated wiring. Preceding the assembly of this mock-up, these details have been worked through and coordinated in many lengthy design workshops, involving the contractor, structural and electrical engineers, the timber sub-contractor, electricians and us architects. As such, it was even more enjoyable to review the mock-up with all the parties involved and to see our combined efforts bearing fruit.

The carpenters who built the mock-up and the Electrical Engineer, Design Manager, and Architect discussing the installation and accessibility of the LED strips

JESUS COLLEGE TOPPING OUT

JANUARY 2017

Jesus College Topping out

On the 11th January Jesus College held a topping out ceremony to celebrate the laying of the final stone on the roof of its West Court development. The project provides state-of-the-art conference and lecture facilities, hotel and student accommodation, and social spaces including a new café and bar.

Professor Ian White who led the ceremony said: “We are delighted that the chance has arisen to restore the college site to its original boundaries and excited by the opportunity it brings to take the facilities we can offer to students, fellows, alumni and the wider world to a new level of excellence. Our West Court Development has an outstanding selection of spaces and accommodation, suitable for a wide range of different uses”

The below image shows the Managing Director of Cocksedge Building Contractors Steve Nugent, the Estates Burser Christopher Pratt and Professor Ian White at the topping out ceremony.