Balliol College, Sports Pavilion

7:45 AM, London Bridge. The train from Uckfield just entered the station and is spitting out hundreds of commuters, flowing past us. We hop on the now empty train and leave London to visit our timber sub-contractor’s workshop in East Sussex.

We are fast approaching the construction stage of our Sports Pavilion project for Balliol College in Oxford and were invited to review a mock-up of the roof structure. The pavilion roof is formed of slender sweet chestnut glulam joists; 10 layers are stacked on top of each other, each layer cantilevering further into the space, creating a coffer.

1:50 model

From outside the roof structure expresses itself as a lantern, popping up in the centre of the building. The lantern is fully glazed, allowing for rays of sunshine to enter through the stacked glulam. In the evening, the dense timber lattice will be highlighted by a subtle glow, originating from LED strips, that are recessed in the top of the glulam joists.

The mock-up in Inwood’s (timber sub-contractor) workshop

Lighting strategy detail plan and section

The mock-up was used to test the connection details between the individual layers of glulam, the construction sequence, and the integration of the LED strips and the associated wiring. Preceding the assembly of this mock-up, these details have been worked through and coordinated in many lengthy design workshops, involving the contractor, structural and electrical engineers, the timber sub-contractor, electricians and us architects. As such, it was even more enjoyable to review the mock-up with all the parties involved and to see our combined efforts bearing fruit.

The carpenters who built the mock-up and the Electrical Engineer, Design Manager, and Architect discussing the installation and accessibility of the LED strips

THE WELCOME BUILDING

SEPTEMBER 2017

The Welcome Building

The Welcome Building in Bishop Auckland consists of a new viewing tower and central ticketing hall for the The Auckland Project. It acts as an access point and gateway to the wider site whilst also giving views over the town and landscape setting. The tower – a timber framed structure – is now well under way on site.

The building team has worked tirelessly and with the highest level of precision, to build the in-situ concrete lift shaft. Working from the ground up seemed to take an age.

Meanwhile, the enormous larch glulam beams have been carefully crafted and manually grey-oiled in the joiner’s workshop.

The frames are now being lifted into position on site and suddenly the building can be seen. Almost in an instant. As if the past four years had happened in the blink of an eye.

We are so excited and proud – even – to see this fantasy project becoming real at last. But with completion on the horizon, time seems to now move all too fast.