< Back to News

AUCKLAND CASTLE WING EXTENSION

MAY 2019

Auckland Castle Wing Extension

Following the completion of the Auckland Tower, the Faith Museum is our second project at Auckland Castle and is an extension to the Grade I listed Scotland Wing. Unlike its vertical sister, which wears its expressed timber structure on the outside, the Faith Museum is singular and monolithic in its appearance, forming a continuous horizontal stone edge to an enclosed courtyard. Cop Crag sandstone, local to the north-east of England, is the external treatment for the roof, walls and weatherings of the building. Far from being homogenous, the stone is alive with natural variation which ranges from delicate lacy swirls to something resembling animal markings.

The principal internal space is a 9.5m tall gallery which follows the steeply pitching roof form, supported by a procession of closely-centred fine metal trusses. The Museum is largely inward-looking, borne of its intended purpose for contemplation and preservation of religious artefacts. This provides further enjoyable contrast and conversation between our two buildings in how they seem to view one another: the Tower’s expansive 360˚ views offering a full appreciation of the Faith Museum in its entirety as begins to take form, whilst the introspective Museum offers the only the slightest peek of its neighbour over the wall.

TAPESTRY BUILDING FILM

JANUARY 2015

Tim Hunt from Argent gives an update on the progress being made on site at the Tapestry (T1) Building at Kings Cross. The building is roughly half way through the construction programme and will soon start to be clad in beautifully ornate terracotta coloured concrete panels. The video shows the impressive views across the city as well as the relationship of the building to nearby landmarks including Regent’s Canal and Gas Holder Number 9. Tim also gives an update on the wider area which is an exciting and rapidly regenerating part of London.

Tapestry is Niall McLaughlin Architects’ largest project to date, the team completed their role as Concept Architect for the project and now have continued involvement as a part of the Client Monitoring Team.