< Back to News

ARCHITECTURE FOUNDATION OF AUSTRALIA CONFERENCE

JANUARY 2014

Architecture Foundation of Australia Conference

Niall McLaughlin has been invited to participate in a conference on Milson Island on the Hawkesbury River in Australia. Organised by the Architecture Foundation Australia, the residential event gathers an international field of speakers to explore a chosen theme. It will take place between the 28th and 30th of March 2014. This year’s theme will be ‘trace de la main’, taken from the comment by engineer Peter Rice that “whereas a Gothic cathedral will express the real and physical presence of the stone from which it was made, and of the masons who laboured over its construction so many years ago, very few modern buildings carry the same physical presence of the materials of which they were built. In short, ‘the trace de la main’, the evidence of those who built it, is not there.”

WORCESTER COLLEGE COMPETITION WIN

JANUARY 2014

Worcester College Competition Win

Niall McLaughlin Architects are delighted to have been announced as winner of the competition to build a new theatre for Worcester College, Oxford. The scheme was picked from among a strong shortlist, including proposals by Hawkins/ Brown, Ian Ritchie and Purcell Architects. The competition brief was to design a 160-seat theatre, together with flexible studio space, seminar rooms and a small bar to be situated within the sensitive site of the College’s listed gardens. The scheme aims to improve the spaces between the old and new buildings of the College and resolve the relationship between these structures, the gardens and the network of small courts around the edge of the site.

PEABODY HOUSING RECEIVES PLANNING PERMISSION

JANUARY 2014

Peabody Housing receives Planning Permission

The practice’s most recent housing scheme for the Peabody Trust has received planning permission from the London Borough of Waltham Forrest. The scheme comprises of seventeen new homes for the social rented sector at a central location in Leytonstone. The project is due for completion in March 2015.