< Back to News

AJ Retrofit Live

November 2022

AJ Retrofit Live

On the 23rd November Níall will be giving a key note speech as part of the AJ Retrofit Live This unique event will bring together architects, their built environment colleagues, developers, clients and lawmakers to identify the best retrofit and circular economy practices and discuss the transformational changes we need to see to upgrade the built environment in line with whole-life carbon principles.

Natural History Museum Progress

March 2017

Natural History Museum Progress

Below are some from the Natural History Museum site showing the scaffold ‘tunnel’ going up at the Museum. This is the framework required to lift, manipulate, and move the blue whale skull into position in a few weeks.

Though the main hall has had a sperm whale in it before, this was only around 15m long. In contrast, the blue whale, the largest known animal to have ever existed, is about 30m long once assembled.

Unfortunately, due to the various extensions and alterations to the Museum over time, the skull can only come in via the front doors. And – much like a very large, very heavy, very valuable sofa – it’s a case of squeezing it in at strange angles.