< Back to News

A SITE FOR SAURIIS

JANUARY 2017

A Site for Sauriis

Our proposal to redevelop the grounds of the Natural History Museum is due to start on site this month. The work to the main entrance – the first of three phases – will introduce level access to this area for the first time while also restoring the Grade-I listed fabric to its former glory.

The works include changing levels, repaving the forecourt, restoring railings, installing planting, and repairing or reinstating original terracotta details across the site.

Ahead of this, the main entrance and central hall of the Museum are now closed while both teams gear up for construction – including some unusual enabling works. As part of these works Dippy the diplodocus has now been dismantled ahead of going on tour around the country; to be eventually recast in bronze for the next phase of our project.

The railings have now been removed for off-site restoration and re-painting:

And scaffolding is also going up for the removal of display cases and various specimens:

This will need to go up again halfway through construction of Phase 1 allow for delivery of the blue whale skull through our active site. Here it is just before it left the Museum.

If you’re wondering how that that will fit through the front doors, the answer’s simple: the same way the elephants do.

Phase 1 is due to complete mid-July ahead of the main entrance reopening to the public shortly after. In the meantime, there’s a pop-up conservation studio in the Darwin Centre – which we highly recommend – where you can see the conservationists at work restoring the whale’s bones.

COLLABORATION WITH KIM WILKIE MAKES NATURAL HISTORY MUSEUM SHORTLIST

NOVEMBER 2013

Collaboration with Kim Wilkie makes Natural History Museum Shortlist

Niall McLaughlin Architects and Kim Wilkie have been shortlisted in a competition to re-imagine the grounds of the Natural History Museum in London. The practice was approached by the landscape designer Kim Wilkie to collaborate on a scheme for the invited competition. The brief is to create an innovative exterior setting that matches the architectural excellence of Waterhouse’s iconic 19th century building.

The five other architect and landscape architect teams shortlisted for the competition are Bjarke Ingels Group with Martha Schwartz Partners, Grant Associates with Feilden Clegg Bradley Studios, Land Use Consultants with Design Engine and Stanton Williams Architects with Bradley-Hole Schoenaich Landscape Architects.